Construction of the Tseung Kwan O Extension

Citation
建築承造雜誌, no.4, 2002, pp. 31-49
Abstract
(1) Introduction (2) The alignment (3) Construction features of the major work portions (a) Tunnel between Lam Tin and Yau Tong Station (b) Yau Tong Station (c) Approach tunnel linking Yau Tong Station and the Eastern Harbour Crossing (d) Black Hill Tunnels (between Yau Tong and Tiu Keng Leng Stations) (e) Tiu Keng Leng Station (f) Tseung Kwan O Station (g) Hang Hau Station (h) Po Lam Station (i) The deport (j) Pak Shing Kok Tunnels (k) Cut-and-cover tunnels (l) Summary
Description
Building Name: Tseung Kwan O Line Building Type(s): Railway stations