Shajiao 'C' Power Station 沙角“C" 發電廠
Authors
Citation
建築承造雜誌, Nov/Dec, 1994, pp. 70-71
Abstract
Shajiao is located half-way between Hong Kong and Guangzhou on the Pearl River, making it an ideal location for coal-fired power stations. A consortium of contractors was awarded the contract for the construction and development of the Shajiao Power Station. The consortium consists of CEPA-Slipform, the civil engineering contractor, GEC-Alsthom which supplied and erected the Turbine and Balance of Plant, and ABB-CE which was responsible for the Boiler. The design-and-build-style project has a 33-month programme from contract signature to the scheduled synchronisation of Unit One in December 1994.
沙角位處香港與廣州中間, 珠江沿岸上, 是建燃煤發電廠的最佳地方。獲得沙角發電廠建造合約的財團, 成員包括: 土木工程承建商CEPA-Slipform﹑GEC-Alsthom及ABB-CE。GCE-Alsthom負責提供和裝置渦輪發電機組, ABB-CE則負責渦爐的供應和安裝。這個設計及建造工程, 從簽署合約到1994年12月第一台發電機組併網止, 為期共33個月。
(1) Method statement 施工方法
Description
Building Name: Shajiao 'C' Power Station
Building Type(s): Power stations
Subject
Type
Article
Format
Date
1994
Language
en,zh