Investigating instruments

Authors
Citation
Asian Architect & Contractor, v.13, no.7, 1983, pp. 32-35
Abstract
(1) A general introduction (a) Basic Technical Equipment (b) Basic geodetic methods (i) Trilateration (ii) High-precision polyonisation (iii) High-precision levelling (iv) Gravimetry (c) Levelling (i) Trigonometric levelling (ii) Geometrical levelling (iii) Special versions (d) Survey and staking out (a) Orthogonal survey (b) Polar survey (c) Staking out (2) New measurement (a) A new tape measure (b) An engineer's level from Carl Zeiss (c) A new vertical level (d) A new angle on measurement (e) Levelling by laser (f) Measuring moisture
Description
Type
Article
Format
Date
1983
Language
en