Tackling the sewage problem 全機械鑽挖方式建造 : Tolo Harbour Effluent Tunnel 沙田/鑽石山污水排放隧道
Authors
Citation
建築承造雜誌, Mar/Apr, 1992, pp. 44-46
Abstract
One of the first Hong Kong tunnel projects in which a full-face hard rock Tunnel Boring Machine (TBM) is being used, this 7.4-km tunnel forms part of Stage I of the Tolo Harbour Effluent Export Scheme (THEES).
政府為了減輕污染問題,實行了一連串的污水處理計劃。全長七點四公里,連接沙田和鑽石山的污水隧道,就是吐露港污水排放計劃第一期的部份工程,並且是首條採用隧道挖鑿機挖掘的政府隧道。 (港燈第二條電纜隧道則是首條使用隧用挖鑿機建築的私人隧道。)
Description
Building Name: Tolo Harbour Effluent Tunnel
Building Type(s): Tunnels
Subject
Type
Article
Format
Date
1992
Language
en,zh