Pioneering concurrent tunnel and station construction on a subway system in Bangkok, Thailand

Citation
Asian Architect & Contractor, v.31, no.3, 2002, pp. 32-34
Abstract
(1) Introduction (2) Description of the structures (3) Ground conditions (4) Design issues (5) Tunnel soil layer 1 (6) Tunnel soil layer 2 (7) Monitoring (8) Conclusions
Description
Type
Article
Date
2002
Language
en