Kowloon challenge

Authors
Citation
Asian Architect & Contractor, v.31, no.7, 2002, pp. 24-26
Abstract
More than 1,500 piles are being bored by a fleet of 12 HD Engineering drill rigs, with air power provided by more than 30 Atlas Copco air compressors, on a project described as "one of the most challenging of Hong Kong's East Rail Extension" (1) Construction (2) HD drilling power (3) Cut-and-cover station excavation
Description
Type
Article
Format
Date
2002
Language
en